Wednesday, October 27, 2010

TerreKleen hydrodynamic separator approved by The MDC - Hartford, CT

Attention: 

Engineers, Contractors and Owners in

Bloomfield, East Hartford, Hartford, Newington, Rocky Hill, West Hartford, Wethersfield and Windsor, CT! 

The TerreKleen hydrodynamic separator has been approved by The MDC for use in projects located within the MDC's jurisdiction.  Here is a link to their confirmation letter.

TerreKleen will capture sediment, trash, debris, oils, it installs quickly and there is no scour or re-suspension of collected material.  Cleanout is easy and does not require confined space entry.  This is a significant short and long-term savings.

Let us know if we can assist with any design and sizing issues!

.

Saturday, September 18, 2010

TerreKleen hydrodynamic separator now improving stormwater runoff at Waccabuc, NY

It was a beautiful day in Waccabuc, Westchester County, NY.  Getting the TerreKleen installed at this site has been a long term project and finally, this past Thursday was the day.  The day of our first of two installations at this site.   We arrived at about 8 AM and the TerreKleen was already on site.



The installation site was right on the edge of a large open field.   Here is a picture of the hole that has been prepared for installation.  The contractor had done a lot of work prepping the installation site the day prior so for the most part, upon arrival, the unit is ready to be installed.  

Contractor makes some final checks and adjustments, re-confirms the gravel bed is level and cleans out some mud that has accumulated overnight.  When everything is confirmed ready for installation, the TerreKleen is lifted off the truck and manipulated into place.

Here is the TerreKleen getting installed into place.  A crane easily lifts the unit into place.  The TerreKleen arrives fully assembled eliminating any additional work that needs to be done on site.

Here is the riser getting installed.  Again, it is a very easy operation - the crane simply lifts the riser and installs it on top of the base of the TerreKleen.  

TerreKleens install quickly as they are designed to assemble on-site with each section manufactured to fit on top of each other.



In about an hour, the TerreKleen is installed and ready to work.  It will remove sediments, trash, debris and oils.

For more information about the TerreKleen or if we can assist you with information about hydrodynamic separators, please contact us at www.stormwaterworks.com

Tuesday, September 14, 2010

Meet us at these upcoming stormwater tradeshows!

Wednesday, October 6, 2010
CCM - CT Conference of Municipalities - Booth 424
(Open to Municipal Officials Only)
Hartford, CT

Wednesday, October 13, 2010
10th Annual Southeast Stormwater Tradeshow 
Dutchess Manor, Beacon, NY
Click here for more details

Thursday, October 14, 2010
North Country Stormwater Tradeshow
Roaring Brook Resort
Lake George, NY

Let us know if you need details! 

Saturday, September 11, 2010

Improving Stormwater runoff at the Ausable River, Wilmington, NY (Part 3)

Crane maneuvering top into place





Almost done
2 hours after starting installation - TerreKleen installed

Improving Stormwater runoff at the Ausable River, Wilmington, NY (Part 2)

Wanted to post a few last pictures so you can see how the installation was completed:

Off the truck, the crane is moving the TerreKleen into position.
Easy does it!  TerreKleen is gently lowered into the hole


Most difficult part of installation complete










Primary chamber on right, inclined plates on left

Improving Stormwater runoff at Ausable River, in a NYS DOT right of way- 3 part post

Wilmington, NY.  The Ausable River in the Adirondack Mountains in upstate New York is known for its world-class trout fishing.

This is the site of our first TerreKleen hydrodynamic separator installation in upstate NY.  The TerreKleen hydrodynamic separator is being installed to capture sediment, trash, oils and debris and prevent its flow into the Ausable River.  

This project is a collaborative effort between Essex County Soil and Water Conservation District and NYSDOT.  The installation of the TerreKleen is in a NYSDOT right of way.

This is a picture of the Ausable River from the site.

Difficult installation site conditions include:
Re-routing traffic on this section of Route 86 until installation complete, small site footprint, excessive low hanging power lines. 

(This is a 3 part post click on stormwaterworks banner at top of page to view additional 2 postings)
This is a look at sediment on this site.






This is an overview of the site as the TerreKleen 
arrives.  This part of Route 86 has been closed for installation.







Monday, August 23, 2010

Improving Stormwater at N. Lake Carmel with a second installation of the TerreKleen

All Equipment in the shoulder
Very Tight Work Area
















It has been an exciting August with our second TerreKleen installation at North Lake Carmel, NY.  Again, the worksite is incredibly small.  All of the heavy duty earth moving equipment barely fits in the road shoulder.  It is important to keep the traffic moving. 


TK09 - 9 cells for particle separation
Don't blink!  (Left) 
The TerreKleen is in place before you know it!  

This is the picture of a smallest TerreKleen unit, the TerreKleen09.  

The 09 represents the number of cells created by the stacked inclined plates for particle separation.  This unit will capture sediment, trash, debris and oils.  











Confirming the TK09 is level
Next step... 

double checking that the TerreKleen has been installed and is level in the hole.

It is important that the gravel in the bottom of the hole provides a level surface for the TerreKleen to sit on.













The crane is moves the lid onto the open TerreKleen.  The top is designed to fit on top of the open TerreKleen.  It takes just a few minutes until the lid is in place.















The installation is complete.  In less than an hour, the large equipment is leaving the site and the TerreKleen is in place ready to do its job.