Wanted to post a few last pictures so you can see how the installation was completed:
| Off the truck, the crane is moving the TerreKleen into position. |
| Easy does it! TerreKleen is gently lowered into the hole |
![]() | ||||||||||
| Most difficult part of installation complete |
| Primary chamber on right, inclined plates on left |

No comments:
Post a Comment