Wednesday, January 12, 2011

TerreKleen 02 installed to capture sediment and improve stormwater runoff

A GREAT KICK-OFF FOR 2011!  Even though it was a bit cold, it was a great day to be outside and see our first Terre Kleen hydrodynamic separator of 2011 installed!


We are on-site at 7:00 AM and the trucker has already arrived.  TerreKleen arrives pre-assembled and ready to install.  This makes installation easy.  


TerreKleen is quickly off the truck and installing in the hole the contractor has prepared.
The conseal (black strip) is quickly applied.  We are now ready to install the riser section.
Riser is being installed














TerreKleen installed!!!

The primary contaminant at this site is sediment.  The TK02 is a smaller TerreKleen unit.  The size of the TerreKleen for each site is chosen based on flow rates and the sediment particle size that client needs to capture.  After pipes are connected and manhole covers put in place, TerreKleen will be fully functioning and will immediately start to work.

Saturday, January 8, 2011

Engineering Expo for HS Kids - Sunday, April 3, 2011 - White Plains HS

We are excited to be volunteering to help pull together the 8th annual engineering expo designed to show middle and high school kids what engineering is.  Kids will have the opportunity to speak with engineers, find out about the diverse career paths available through engineering and how they can "get there".  The expo is scheduled for Sunday, April 3rd at White Plains High School.


Many local engineering firms, businesses, government agencies will be represented at the expo.  Additionally, a number of colleges and universities will be on hand to discuss their engineering programs as well as college finances.  (Last year we had about 1500 students attend and 35 college programs were represented)


Attendance is free.


The special guest at the expo will be Marshall Brain, Founder of "How Stuff Works" a program on The Discovery Channel.


If you are a company and can help sponsor the event, if you are a college/university and you can exhibit at our event or you are a middle or high school student that wants to learn more about engineering careers, please come to our great website and register!  www.BeAnEngineer.org


Hope to see you there!  Should really be a great day!

Wednesday, October 27, 2010

TerreKleen hydrodynamic separator approved by The MDC - Hartford, CT

Attention: 

Engineers, Contractors and Owners in

Bloomfield, East Hartford, Hartford, Newington, Rocky Hill, West Hartford, Wethersfield and Windsor, CT! 

The TerreKleen hydrodynamic separator has been approved by The MDC for use in projects located within the MDC's jurisdiction.  Here is a link to their confirmation letter.

TerreKleen will capture sediment, trash, debris, oils, it installs quickly and there is no scour or re-suspension of collected material.  Cleanout is easy and does not require confined space entry.  This is a significant short and long-term savings.

Let us know if we can assist with any design and sizing issues!

.

Saturday, September 18, 2010

TerreKleen hydrodynamic separator now improving stormwater runoff at Waccabuc, NY

It was a beautiful day in Waccabuc, Westchester County, NY.  Getting the TerreKleen installed at this site has been a long term project and finally, this past Thursday was the day.  The day of our first of two installations at this site.   We arrived at about 8 AM and the TerreKleen was already on site.



The installation site was right on the edge of a large open field.   Here is a picture of the hole that has been prepared for installation.  The contractor had done a lot of work prepping the installation site the day prior so for the most part, upon arrival, the unit is ready to be installed.  

Contractor makes some final checks and adjustments, re-confirms the gravel bed is level and cleans out some mud that has accumulated overnight.  When everything is confirmed ready for installation, the TerreKleen is lifted off the truck and manipulated into place.

Here is the TerreKleen getting installed into place.  A crane easily lifts the unit into place.  The TerreKleen arrives fully assembled eliminating any additional work that needs to be done on site.

Here is the riser getting installed.  Again, it is a very easy operation - the crane simply lifts the riser and installs it on top of the base of the TerreKleen.  

TerreKleens install quickly as they are designed to assemble on-site with each section manufactured to fit on top of each other.



In about an hour, the TerreKleen is installed and ready to work.  It will remove sediments, trash, debris and oils.

For more information about the TerreKleen or if we can assist you with information about hydrodynamic separators, please contact us at www.stormwaterworks.com

Tuesday, September 14, 2010

Meet us at these upcoming stormwater tradeshows!

Wednesday, October 6, 2010
CCM - CT Conference of Municipalities - Booth 424
(Open to Municipal Officials Only)
Hartford, CT

Wednesday, October 13, 2010
10th Annual Southeast Stormwater Tradeshow 
Dutchess Manor, Beacon, NY
Click here for more details

Thursday, October 14, 2010
North Country Stormwater Tradeshow
Roaring Brook Resort
Lake George, NY

Let us know if you need details! 

Saturday, September 11, 2010

Improving Stormwater runoff at the Ausable River, Wilmington, NY (Part 3)

Crane maneuvering top into place





Almost done
2 hours after starting installation - TerreKleen installed

Improving Stormwater runoff at the Ausable River, Wilmington, NY (Part 2)

Wanted to post a few last pictures so you can see how the installation was completed:

Off the truck, the crane is moving the TerreKleen into position.
Easy does it!  TerreKleen is gently lowered into the hole


Most difficult part of installation complete










Primary chamber on right, inclined plates on left