We are excited to be volunteering to help pull together the 8th annual engineering expo designed to show middle and high school kids what engineering is. Kids will have the opportunity to speak with engineers, find out about the diverse career paths available through engineering and how they can "get there". The expo is scheduled for Sunday, April 3rd at White Plains High School.
Many local engineering firms, businesses, government agencies will be represented at the expo. Additionally, a number of colleges and universities will be on hand to discuss their engineering programs as well as college finances. (Last year we had about 1500 students attend and 35 college programs were represented)
Attendance is free.
The special guest at the expo will be Marshall Brain, Founder of "How Stuff Works" a program on The Discovery Channel.
If you are a company and can help sponsor the event, if you are a college/university and you can exhibit at our event or you are a middle or high school student that wants to learn more about engineering careers, please come to our great website and register! www.BeAnEngineer.org
Hope to see you there! Should really be a great day!
Saturday, January 8, 2011
Wednesday, October 27, 2010
TerreKleen hydrodynamic separator approved by The MDC - Hartford, CT
Engineers, Contractors and Owners in
Bloomfield, East Hartford, Hartford, Newington, Rocky Hill, West Hartford, Wethersfield and Windsor, CT!
The TerreKleen hydrodynamic separator has been approved by The MDC for use in projects located within the MDC's jurisdiction. Here is a link to their confirmation letter.
TerreKleen will capture sediment, trash, debris, oils, it installs quickly and there is no scour or re-suspension of collected material. Cleanout is easy and does not require confined space entry. This is a significant short and long-term savings.
Let us know if we can assist with any design and sizing issues!
TerreKleen will capture sediment, trash, debris, oils, it installs quickly and there is no scour or re-suspension of collected material. Cleanout is easy and does not require confined space entry. This is a significant short and long-term savings.
Let us know if we can assist with any design and sizing issues!
Saturday, September 18, 2010
TerreKleen hydrodynamic separator now improving stormwater runoff at Waccabuc, NY
The installation site was right on the edge of a large open field. Here is a picture of the hole that has been prepared for installation. The contractor had done a lot of work prepping the installation site the day prior so for the most part, upon arrival, the unit is ready to be installed. Contractor makes some final checks and adjustments, re-confirms the gravel bed is level and cleans out some mud that has accumulated overnight. When everything is confirmed ready for installation, the TerreKleen is lifted off the truck and manipulated into place.
Here is the TerreKleen getting installed into place. A crane easily lifts the unit into place. The TerreKleen arrives fully assembled eliminating any additional work that needs to be done on site.
Here is the riser getting installed. Again, it is a very easy operation - the crane simply lifts the riser and installs it on top of the base of the TerreKleen.
In about an hour, the TerreKleen is installed and ready to work. It will remove sediments, trash, debris and oils.
For more information about the TerreKleen or if we can assist you with information about hydrodynamic separators, please contact us at www.stormwaterworks.com
Tuesday, September 14, 2010
Meet us at these upcoming stormwater tradeshows!
Wednesday, October 6, 2010
CCM - CT Conference of Municipalities - Booth 424
(Open to Municipal Officials Only)
Hartford, CT
Wednesday, October 13, 2010
10th Annual Southeast Stormwater Tradeshow
Dutchess Manor, Beacon, NY
Click here for more details
Thursday, October 14, 2010
North Country Stormwater Tradeshow
Roaring Brook Resort
Lake George, NY
Let us know if you need details!
Roaring Brook Resort
Lake George, NY
Let us know if you need details!
Saturday, September 11, 2010
Improving Stormwater runoff at the Ausable River, Wilmington, NY (Part 3)
Improving Stormwater runoff at the Ausable River, Wilmington, NY (Part 2)
Wanted to post a few last pictures so you can see how the installation was completed:
| Off the truck, the crane is moving the TerreKleen into position. |
| Easy does it! TerreKleen is gently lowered into the hole |
![]() | ||||||||||
| Most difficult part of installation complete |
| Primary chamber on right, inclined plates on left |
Improving Stormwater runoff at Ausable River, in a NYS DOT right of way- 3 part post
Wilmington, NY. The Ausable River in the Adirondack Mountains in upstate New York is known for its world-class trout fishing.This project is a collaborative effort between Essex County Soil and Water Conservation District and NYSDOT. The installation of the TerreKleen is in a NYSDOT right of way.
| This is a picture of the Ausable River from the site. |
Difficult installation site conditions include:
Re-routing traffic on this section of Route 86 until installation complete, small site footprint, excessive low hanging power lines.
(This is a 3 part post click on stormwaterworks banner at top of page to view additional 2 postings)
| This is a look at sediment on this site. |
| This is an overview of the site as the TerreKleen arrives. This part of Route 86 has been closed for installation. |
Subscribe to:
Posts (Atom)


